Planned Road Construction Sites For 30 Days...
Planned Road Construction Sites For 30 Days And 1 Year With Location In Bonn)
This dataset falls under the category Traffic Generating Parameters – Other.
It contains the following data: All planned major civil engineering works
in public traffic areas that last at least one week and/or are of traffic significance are summarised in a master plan. The dates for the start and end of construction are not binding; emergency measures are updated shortly after. . The data can be accessed using the following URL / API Endpoint: https://stadtplan.bonn.de/geojson?Thema=14755
This dataset was scouted on 2022-02-08 as part of a data sourcing project conducted by TUMI. License information might be outdated: Check original source for current licensing.
URL: https://stadtplan.bonn.de/geojson?Thema=14755
Não há visões criadas para este recurso ainda.
Informações Adicionais
Campo | Valor |
---|---|
Dados atualizados pela última vez | 5 de abril de 2023 |
Metadados atualizados pela última vez | 28 de abril de 2023 |
Criado | 5 de abril de 2023 |
Formato | url |
Licença | Nenhuma licença fornecida |
Action | resource_create |
Datastore active | False |
Datastore contains all records of source file | False |
Has views | False |
Id | 1b019ee0-7a2f-e65f-a2b7-4954bee3757a |
Package id | 2ef1dc40-b6aa-14ed-391f-bc67b958d41d |
Position | 0 |
State | active |