Planned Road Construction Sites For 30 Days And 1 Year With Location In Bonn
This dataset falls under the category Traffic Generating Parameters Other.
It contains the following data: All planned major civil engineering works in public traffic areas that last at least one week and/or are of traffic significance are summarised in a master plan. The dates for the start and end of construction are not binding; emergency measures are updated shortly after.
This dataset was scouted on 2022-02-08 as part of a data sourcing project conducted by TUMI. License information might be outdated: Check original source for current licensing. The data can be accessed using the following URL / API Endpoint: https://stadtplan.bonn.de/geojson?Thema=14755

Sobre este conjunto de dados

Autor/autora
criado
Grupo
Organização
Formatos

Acesso e Uso

Público
Non-federal
Licença

Download & Ressources

Location

Additional Metadata

Informações Adicionais
Campo Valor
Fonte https://stadtplan.bonn.de/geojson?Thema=14755
Versão 1.0.0
Autor/autora see data set URL
E-mail do autor
Mantenedor Scouted by TUMI project; resp. Frederic Tesfay
E-mail do Mantenedor feedback@tumidata.org
spatial {"type": "Polygon", "coordinates": [[[7.0225354, 50.6326909], [7.0225354, 50.7744233], [7.2106794, 50.7744233], [7.2106794, 50.6326909], [7.0225354, 50.6326909]]]}